This company is committed to install and run two installs venezia will visit the project periodically after the compelet delivery of the project
the following items are considered in the periodic reviews
installation safety in terms of correct connection
healthy floor space used , balance of concrete and floor for warehouses
observe the installation standards
checking the location of the passage and the use of personnel from the system
investigate and train the proper use of the staff in accordance with product standards